DBIM · Integrated Management Systems ISO 9001 · ISO 14001 · ISO 45001
Integrated Management System Build

One system. Not three parallel ones.

Not three consultants, three manuals and three separate audit programmes. Quality, Environmental and Health & Safety built through one management framework, one implementation project and one joined-up route to certification.

Programme 12–20 weeks

From gap analysis through implementation to certification readiness.

Integrated build £10k–£30k

Fixed after the gap analysis once the actual scope is understood.

Management framework 1 system

One audit programme and one management-review framework across the standards.

The integration principle Define the common management processes once.

Integration does not mean pretending Quality, Environmental and Health & Safety are the same discipline. It means sharing the management structure where the standards ask essentially the same organisational question, while keeping customer conformity, environmental aspects and OH&S risk controls specific where they need to be.

The objective is less duplication, not less control. Build the common framework once, keep the technical requirements credible, and leave the business with one management system its own people can actually maintain.

01 · One System, Not Three

Write the common parts once. Keep the technical parts specific.

The three standards share a common management-system structure. Build them separately and the same organisational processes get documented, audited and reviewed repeatedly. Integrate them and those common processes operate once across the business.

The practical difference

Integration removes duplication, not discipline.

Context, leadership, competence, documented information, audit and review do not need three parallel systems.

Those common management processes can run once across Quality, Environmental and Health & Safety.

Customer conformity, environmental aspects and OH&S hazards remain distinct because they describe genuinely different risks and controls.

Clause area What can be integrated?
ISO 9001 Quality
ISO 14001 Environmental
ISO 45001 Health & Safety
Context of the organisation, including climate change
Shared
Shared
Shared
Leadership
Shared
Shared
Shared
Risk and opportunity
Shared
Shared
Shared
Planned change management
Shared
Shared
Shared
Competence and awareness
Shared
Shared
Shared
Documented information
Shared
Shared
Shared
Internal audit · management review · improvement
Shared
Shared
Shared
Customer requirements and product conformity
Specific
—
—
Aspects and impacts · environmental legal register
—
Specific
—
Hazard identification · worker consultation and participation
—
—
Specific
Shared framework

Run once across the business.

Context, leadership, competence, documented information, internal audit, management review and improvement can operate through one integrated management framework.

Technical controls

Keep the disciplines credible.

Quality conformity, environmental aspects and OH&S hazards need their own technical methods, controls and evidence. Integration should never blur what each standard is actually trying to manage.

Current structure Integration is becoming cleaner, not harder.

The current editions of ISO 9001 and ISO 14001 align closely with the harmonised management-system structure, while ISO 45001 already follows the same overall framework. That increases the amount of management-system architecture that can sensibly be defined once rather than recreated standard by standard.

One system should mean one way of managing the business, not three standards squeezed into one manual. Share the organisational framework, keep the technical controls distinct, and make integration reduce administration without weakening the disciplines.

02 · Standards & Versions

Build for where the standards are now.

The three standards are at different points in their revision cycles. The build should use the current published requirements while avoiding obvious rework as certification and transition programmes move forward.

Standard Discipline
Status today Revision position
What that means Current position
DBIM build basis What we build to
Environmental ISO 14001
Status today Published 2026 edition

ISO 14001:2026 was published in April 2026. Existing 2015 certificate holders now have a transition period in which to move their environmental management systems to the revised edition.

We build to ISO 14001:2026

New environmental management systems are built around the current requirements rather than deliberately creating a new system against the superseded 2015 edition.

Quality ISO 9001
Status today Published 2026 edition

ISO 9001:2026 was published on 16 September 2026. During the certification transition period, the edition against which an initial certificate can be issued depends on the timing and accreditation readiness of the chosen certification body.

We build to ISO 9001:2026

The QMS is designed around the current edition from the beginning, avoiding a new implementation that immediately requires substantive transition work.

Health & Safety ISO 45001
Status today Revision in progress Current published edition remains 2018

ISO 45001:2018 remains the current published occupational Health & Safety management-system standard, with Amendment 1:2024 incorporated into the current certification position while the next revision progresses through development.

We build to ISO 45001:2018 + Amd 1:2024

Build worker consultation, participation, hazard identification, hierarchy-of-controls thinking and the shared management structure properly now. A functioning system should then be considerably easier to transition when the revised edition is eventually published.

The build principle

Don't knowingly build rework into a new IMS.

Use the published 2026 editions where they already exist. Use the current published 45001 edition until its replacement actually arrives.

ISO 9001 and ISO 14001 can now be designed directly around their 2026 requirements.

ISO 45001 is different. A future revision should be planned for, but a draft is not the basis for claiming conformity or certification today.

01 ISO 9001

Build the Quality management system to ISO 9001:2026.

02 ISO 14001

Build the Environmental management system to ISO 14001:2026.

03 ISO 45001

Build the OH&S management system to ISO 45001:2018 with Amendment 1:2024.

The IMS should be current on day one without pretending an unpublished future standard is already in force. That means 2026 for Quality and Environmental management, and the current ISO 45001 requirements for Health & Safety until its next edition is formally published.

03 · Implementation Programme

The 12 to 20 week integrated build.

Length varies with size, the standards in scope and how much useful structure already exists. The example below shows how a typical three-standard implementation could be sequenced from gap analysis through to Stage 2.

Illustrative worked example · Three standards · Around 120 employees · Not a named client project
Programme
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Phase 01 Gap analysis & design Weeks 1–3
Phase 02 Build Weeks 4–10
Phase 03 Embed Weeks 11–14
Phase 04 Internal audit &
management review
Weeks 15–17
Phase 05 Stage 1 & Stage 2 Weeks 18–20
Gap & build
Embed
Audit & review
Certification
Week 6
Certification-body conversation starts here.

We start identifying suitable UKAS-accredited certification bodies and comparing availability early so Stage 2 can land around the end of the implementation programme rather than becoming the thing that delays it.

Independent certification

The certification body runs Stage 1 and Stage 2.

DBIM builds the system and prepares your team. The certification body independently assesses it.

We help choose a UKAS-accredited body, compare quotations and prepare for both audits. We do not attend Stage 1 or Stage 2. Any findings are worked through with you afterwards within the agreed project scope.

The phase not to compress

Embed is where the system becomes normal work.

Training, toolbox sessions and live use matter more than a perfectly finished folder.

Quality processes, environmental controls, worker participation, objectives and management routines need enough time to become recognisable to the people who will still be running the system two years later.

The aim is not simply to reach week 20. It is to arrive at Stage 2 with enough live evidence that the integrated management system already behaves like part of the business rather than something created for the certification audit.

04 · What's Included

Everything needed. Without three systems' worth of admin.

The integrated build covers the common management framework and the technical requirements of the standards in scope. Thirteen core deliverables, organised as one connected project.

01
Stage 01

Define

01
Gap analysis

On-site review, written gap report and fixed implementation quote.

02
Scope, context & interested parties

Defined around the organisation rather than copied from a template.

03
Process map

How the business actually operates, mapped with your managers.

Outcome: understand what exists and design the integrated framework around it.

02
Stage 02

Build

04
Risk & opportunity

Integrated Quality, Environmental and OH&S planning.

05
Aspects & impacts

ISO 14001 register built around the organisation's real processes.

06
Hazard identification

ISO 45001 arrangements built on the risk assessments already in use.

07
Legal & compliance

Relevant obligations across the standards in scope.

08
Documented information

Only the procedures and records the management system genuinely needs.

09
Objectives & KPIs

Owned measures linked where possible to numbers management already reviews.

Outcome: shared management structure with credible discipline-specific controls.

03
Stage 03

Prove

10
Internal audit programme

Designed, scheduled and the first full integrated cycle run alongside your team.

11
Stage 1 & Stage 2 findings

Findings closed out with you inside the agreed fixed implementation fee.

12
Management review

First integrated review facilitated, with a practical agenda your team can reuse.

Outcome: evidence that the system works before external certification.

04
Stage 04

Certify

13
Certification body support

Help choosing a UKAS-accredited body, comparing quotes and preparing for Stage 1 and Stage 2.

Independent assessment: the certification body runs both audits. DBIM prepares your team but does not attend them.

At handover Your people should know how to run it.

The first audit cycle and management review are run alongside your team. Ongoing DBIM support is available afterwards, but the integrated management system is built for the organisation to own rather than creating permanent consultant dependency.

05 · What It Costs

Fixed after we know what we're actually building.

A three-standard system for one established site is not the same project as integrating multiple sites with little usable structure. The gap analysis establishes the real scope before the build price is fixed.

Integrated implementation
£10,000–£30,000 fixed project fee

Agreed after the gap analysis and invoiced in four stages.

Why the range?

The standards are only one part of the workload.

The final figure reflects the standards in scope, number of sites, workforce and operational complexity, how much useful documentation already exists and how much internal resource can carry actions between visits.

Once the gap analysis is complete, the fee is fixed. If our estimate means the implementation takes longer, that is our problem rather than another invoice.

What moves the number Four things usually explain where the project lands within the range.
01

Standards in scope

Lower

One or two

Higher

All three

02

Sites & headcount

Lower

Single site · ~50

Higher

Multiple sites · ~500

03

Existing documentation

Lower

Good foundations

Higher

Close to nothing

04

Internal resource

Lower

Someone carries actions

Higher

No internal resource

1 standard £900

Starting gap analysis.

2 standards £1,300

Integrated starting review.

3 standards £1,700

Full integrated gap analysis.

Additional site + £450

For each extra site in scope.

Payment & travel

Four project stages.

Payment is staged at signing, build completion, completion of the internal audit and management review, and certification recommendation. The first 40 miles of travel are included. Travel beyond that is charged separately.

Separate cost

Certification body fees.

Certification-body fees are paid directly to the independent certification body. £4,000–£9,000 across a three-year cycle is the working planning range in your current pricing model. DBIM helps compare quotations before appointment.

Go ahead within six months of the gap-analysis report and the gap fee is deducted from the implementation. You know the fixed build cost before committing to the full project.

06 · Single or Integrated?

One standard now, or more on the horizon?

Integration is not automatically the right answer. If the business genuinely needs one certificate for one customer, build one standard. If two or three standards are coming, designing the shared framework once is usually the better investment.

If you only need

One standard, for one customer.

£4,000–£10,000

Keep it proportionate. There is little value paying for an integrated system when the commercial requirement genuinely stops at one standard.

01 One clear certification requirement
02 No second standard planned
03 Smaller initial project

Best route: standalone ISO 9001, ISO 14001 or ISO 45001 implementation.

If you have

Two or more on the horizon.

£10,000–£30,000

Integrate from the beginning. Build the common management processes once and add the Quality, Environmental and OH&S-specific controls inside the same framework.

01 Customers want multiple QHSE credentials
02 Limited internal resource to run parallel systems
03 One standard already held, with another being added

Best route: one integrated framework, audit programme and management review.

Simple rule Don't integrate for the sake of it.

Integrate when it removes duplication the business would otherwise have to maintain. If there is no realistic second standard coming, a well-built standalone system can be the cleaner and cheaper answer.

07 · After Certification

Certification is the start of the three-year cycle.

The system continues running between certification-body visits. Internal audits, objectives, compliance checks, corrective actions and management review are what stop the IMS drifting before surveillance.

Certification cycle Month 0 → Month 36

The certification body checks the system periodically. Your organisation has to keep it working in between.

Month 0 Certificate

Initial certification completed.

Month 12 Surveillance

First annual certification-body surveillance visit.

Month 24 Surveillance

Second surveillance visit and continuing system review.

Month 36 Recertification

Full recertification assessment for the next cycle.

Year 1 Learn what drifts

Run the audit programme, review objectives and correct early weaknesses.

Year 2 Keep it active

Update risks, legal obligations, controls and processes as the business changes.

Year 3 Prepare to renew

Make sure the full system is ready for recertification rather than rebuilding it beforehand.

The real risk

Systems drift between certification visits.

Documents age, actions stall and operational changes happen faster than management systems get updated.

That drift is what later appears as surveillance findings. Maintenance means keeping the audit programme moving, closing actions, updating risks and compliance obligations, reviewing objectives and making sure the IMS continues to reflect the organisation it is supposed to manage.

Optional ongoing support Fractional HSEQ can keep the full integrated system moving after handover.
Fractional HSEQ

Active QHSE

£800 / month

Ongoing external QHSE support for businesses that can handle much of the day-to-day internally.

Fractional HSEQ

Embedded QHSE

£1,350 / month

More regular involvement in maintaining, reviewing and developing the integrated system.

Fractional HSEQ

Embedded Plus QHSE

£1,950 / month

Higher-touch ongoing support where the business needs greater external QHSE capacity.

Every tier Core support includes
01 Advice line
02 Annual QHSE Compliance Check
03 Integrated internal audit programme
04 Named H&S competent-person cover

You do not have to take ongoing support. The IMS is built for your own people to run, and the first internal audit and management review are completed alongside them. Maintenance is still real work though, whether your team owns it internally or DBIM supports it afterwards.

08 · Who This Is For

Usually the business has outgrown doing this separately.

Integrated systems make the most sense where Quality, Environmental and Health & Safety requirements are beginning to overlap. The common theme is avoiding three parallel systems when one controlled framework can do the job properly.

Typical fit Operational SMEs · 10 to 500 people

Particularly suited to manufacturers, engineering firms and warehousing or distribution operations where Quality, Environmental and Health & Safety controls already overlap day to day.

01 Customer pressure

Certification is becoming a condition of supply.

A tier-one customer or tender now expects more than one management-system credential.

02 Adding standards

You already hold one and need a second or third.

Extend the framework you already have without creating another separate audit and review system.

03 Acquisition or growth

The business has ended up with competing systems.

Bring different processes, legacy documents or acquired systems into one controlled version of the truth.

04 System rescue

A cheap template implementation has not survived reality.

Retain the useful material and rebuild the system around how the business genuinely operates.

Not sure? Start with the commercial requirement.

If you genuinely only need one standard, DBIM will recommend one standard. Integration becomes valuable when multiple requirements are already present or realistically coming, not simply because three certificates sound better than one.

09 · Common Questions

Before you commit to an integrated build.

The main questions are usually about which standards to build against, whether integration really saves money, timescale, existing certificates and who handles independent certification.

01 Which version of each standard will the system be built to?

ISO 9001 and ISO 14001 are built around their 2026 editions. This avoids deliberately creating a new Quality or Environmental management system around an older edition that already has a transition ahead of it.

ISO 45001 is built to the current published requirements: ISO 45001:2018 with Amendment 1:2024. The next ISO 45001 revision is treated as a future transition rather than building certification claims around an unpublished edition.

02 How long does an integrated ISO build take?

DBIM typically plans 12 to 20 weeks from gap analysis through to certification readiness.

The main variables are the number of standards, sites and people in scope, the quality of the existing management-system foundations and how much internal resource can carry actions between visits.

Certification-body availability can become the final constraint, which is why DBIM starts the certification-body conversation around week six rather than waiting until week eighteen.

03 Is it cheaper to build all three at once than one at a time?

Normally, yes, where the business genuinely expects to need all three.

Context, leadership, competence, documented information, audit, corrective action and management review can be designed once rather than recreated each time another standard is added.

The genuine technical differences remain separate: customer and product controls for Quality, environmental aspects and compliance for ISO 14001, and OH&S hazards and worker participation for ISO 45001.

04 What if we already hold ISO 9001?

A working ISO 9001 system provides much of the management framework already.

The project can concentrate more heavily on the new technical requirements, such as environmental aspects and compliance obligations for ISO 14001, or hazard identification and worker participation for ISO 45001.

That can put the project towards the lower end of the integrated-build range, but the existing system still needs reviewing before the scope and fee can be fixed.

05 Do you handle the certification body?

DBIM helps identify suitable UKAS-accredited certification bodies, compare quotations and prepare your team for Stage 1 and Stage 2.

The certification body remains independent and conducts both audits. DBIM does not certify the management system and does not attend the certification audits.

Any findings arising from Stage 1 or Stage 2 are then worked through with you inside the agreed implementation scope.

06 What happens if the project takes longer than expected?

The implementation fee is fixed once the gap analysis has established the scope.

If the agreed build takes longer than DBIM estimated, that does not become an accumulating day-rate invoice.

The price only needs revisiting where you ask to change the agreed scope, such as adding another site, standard or materially different area of the organisation after the project has been agreed.

Programme 12–20 weeks

Typical integrated implementation through to certification readiness.

Build £10k–£30k

Fixed after the gap analysis establishes the actual project scope.

Framework 1 system

One integrated audit programme and management-review framework.

DBIM · Integrated Management Systems ISO 9001 · ISO 14001 · ISO 45001
The first step

It starts with a gap analysis.

One to two days on site, depending on the standards in scope. We look at what already exists, what can be integrated and what genuinely needs building.

You get a written report and a fixed implementation quote before deciding whether to proceed. The report remains useful even if you decide to take the implementation elsewhere.

Start here Tell us which standards are in scope.

One existing certificate, two new standards, all three from scratch, or a mixture of systems that need bringing together.

Get in contact →
One standard £900

Typically one day on site.

Two standards £1,300

Typically around a day and a half.

Three standards £1,700

Typically two days for a full integrated review.

What happens next Three outputs before you commit.
01 See the gaps

Understand what's missing and what can already be retained.

02 See the route

Understand how the standards can be integrated around the business.

03 See the price

Receive the fixed build fee before committing to implementation.

Where we work Greater Manchester & the North West as standard.

DBIM supports businesses across Manchester, Bolton, Bury, Stockport, Rochdale, Oldham, Preston, Blackburn, Warrington and Trafford , with appointments elsewhere in the UK where the required site work and travel arrangement make sense for both sides.